Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

PIVOTED POWER LLP

1 unique locations (2 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (2 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)

Storage (Duration 1h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 ME10
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Loading map...
Showing 1 locations