Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCTOPUS ENERGY LIMITED

11 unique locations (135 components)

Active MW: 1587.45 MW
Inactive MW: 268.22 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (35 components)
• EV charging at residential premises
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.81 MW
3 Nairn Road, Deans Industrial Estate, Livingston, West Lothian, EH54 8AY (9 components)
• EV charging at residential premises
• Newbuild gas generator
• Reciprocating engine (natural gas fuelled)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
9 J3 Business park, Balby Carr Bank, Doncaster, DN4 8DE (12 components)
• A new build gas fuelled generating station.
• EV charging at residential premises
Active • 2026-27 (T-4), 2020-21 (T-4) ...
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (14 components)
• EV charging at residential premises
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Briar Chemicals, Sweet Briar Road, Norwich, NR6 5AP (6 components)
• EV charging at residential premises
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Headways, Stanley, Wakefield WF3 4BY, United Kingdom (26 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New reciprocating gensets in acoustic enclosure
• Octopus Energy customers actively turning down their demand when requested to do so
Active • 2028-29 (T-4), 2026-27 (T-4) ...
LAND AT CLARENCE STREET STALYBRIDGE SK15 1QF (4 components)
• CMU consisting of a gas reciprocating engine and alternator
• EV charging at residential premises
Active • 2026-27 (T-4), 2021-22 (T-1) ...
LAND ON THE SOUTH EAST SIDE OF WHITEGATE WHITE LUND INDUSTRIAL ESTATE MORECAMBE LA3 3DU (4 components)
• CMU consisting of multiple reciprocating engines and alternators
• EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
• EV charging at residential premises
Active • 2027-28 (T-4), 2022-23 (T-3) ...
OIL SITES ROAD NYNAS REFINERY ELLESMERE PORT CHESHIRE WEST CH65 4EF (4 components)
• CMU consisting of a gas reciprocating engine and alternator
• EV charging at residential premises
Active • 2026-27 (T-4), 2021-22 (T-1) ...
To be provided (2 components)
• 10 Gas reciprocating engines use for power generation with associated infrastructure
• Flexible operation of Octopus Energy customers low carbon technologies (EVs / heatpumps)
Active • 2027-28 (T-4), 2022-23 (T-3)
19.76 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (19 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• EV charging at residential premises
• Generating Unit 2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 11 locations