Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCTOPUS ENERGY LIMITED

7336 unique locations (66952 components) - Page 269 of 294

Active MW: 1408.48 MW
Inactive MW: 447.19 MW
BN41 (16 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.04 MW
BN3 (68 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
BN27 (26 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.04 MW
BN25 (51 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.04 MW
BN23 (15 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.08 MW
BN22 (14 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.08 MW
BN21 (14 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
BN2 (57 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
BN17 (21 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1) ...
0.08 MW
BN16 (51 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.04 MW
BN15 (34 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-1) ...
0.04 MW
BN14 (52 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.08 MW
BN13 (29 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.04 MW
BN12 (39 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
BN10 (14 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.04 MW
BN1 (51 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
BLYTH GROVE WORKSOP NOTTINGHAMSHIRE S81 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
BLYTHE ROAD CORFE MULLEN BH21 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
BLYTH COURT TATTENHOE MILTON KEYNES MK4 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
3.60 MW
Blumfield Crescent Slough Berkshire SL1 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Blue Lane Oxted Surrey RH8 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
BLUE HILL CRESCENT, LEEDS, LS12 (9 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2023-24 (T-1) ...
7.01 MW
BLUE HILL CRESCENT LEEDS LS12 (7 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
7.01 MW
Bluegown Avenue West Malling Kent ME19 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Blue Flame Road, Canterbury, Kent, CT3 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
Loading map...
Showing 25 locations