Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCTOPUS ENERGY LIMITED

7336 unique locations (66952 components) - Page 14 of 294

Active MW: 1404.48 MW
Inactive MW: 451.19 MW
Wheat Hold, Wolverton, RAMSDELL, TADLEY, HAMPSHIRE, RG26 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
WHEATFIELD STALYBRIDGE CHESHIRE SK15 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Wheatfield Close Stockport Cheshire SK6 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Whateley Green, Sutton Coldfield, West Midlands, B74 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
WHARTON ROAD HEADINGTON OXFORD OX3 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
WHARF WAY, HUNTON BRIDGE, KINGS LANGLEY, HERTFORDSHIRE, WD4 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
wharfedale road long eaton nottingham NG10 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
WHARFEDALE DRIVE RAINHILL PRESCOT MERSEYSIDE L35 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
WHADDON LANE OWSLEBURY WINCHESTER HAMPSHIRE SO21 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
14.29 MW
WF9 (39 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.08 MW
WF8 (25 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
WF6 (12 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.04 MW
WF5 (41 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
WF4 (77 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
WF3 (47 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
WF2 (37 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.12 MW
WF17 (33 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.08 MW
WF16 (6 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
WF14 (29 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.04 MW
WF12 (22 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.08 MW
WF11 (6 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1) ...
0.04 MW
WF10 (29 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.04 MW
WF1 (34 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
Weyside Close Byfleet West Byfleet Surrey KT14 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Weymouth Drive, Houghton Le Spring, DH4 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
Loading map...
Showing 25 locations