Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Limejump Virtual 1 Limited

16 unique locations (78 components)

Active MW: 393.19 MW
Inactive MW: 784.54 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham TS22 5PW (5 components)

5.2MW of batteries across several sites

Active • 2021-22 (T-4), 2018-19 (T-1)
Breach Farm, Cadley Lane, Caldwell, Swadlincote DE12 6RJ (4 components)

9.8 MW Storage facility located at Swadlincote

Active • 2018-19 (T-1)
Denmead Farm Edneys Lane Denmead Waterlooville PO8 0SJ (1 component)

24.95 MW of Battery Storage located at Waterlooville.

Inactive • 2021-22 (T-4)
Denmead Farm, Edneys Lane, Denmead, Waterlooville PO8 0SJ (1 component)

25 MW of Battery Storage located at Waterlooville.

Inactive • 2021-22 (T-4)
Hungerford Farm, Winchfield, Hook RG27 8SW (6 components)

5.4 MW of battery storage units across different sites

Active • 2021-22 (T-4), 2018-19 (T-1)
Land at Manor Farm Wainfleet Road Irby in the Marsh Skegness Lincolnshire PE24 5AY (1 component)

9.408 MW of Battery Storage at Land at Manor Farm, Lincolnshire.

Inactive • 2021-22 (T-4)
Land at Walworth Farm Bishops Itchington Southam Warwickshire CV47 2SR (2 components)

15 MW Battery Storage facility located at Warwickshire.

Active • 2021-22 (T-4)
Land North of Bumpers Farm, Bumpers Lane, Ilmer HP27 9RE (2 components)

5 MW of Battery Storage located at Ilmer.

Active • 2021-22 (T-4)
Land North of Clayhill Farm Westoning MK45 5JD (9 components)
• 6 MW Battery Storage facility located at Westoning.
• 6MW of demand reduction
Active • 2021-22 (T-4), 2018-19 (T-1)
Land North of Harriots Hayes Lane Albrighton Shropshire WV8 1RQ (1 component)

4.704 MW of Battery Storage located at Shropshire.

Inactive • 2021-22 (T-4)
Land West of Clay Hill Pit Larport farm Larport Lane Dormington Hereford HR1 4EP (1 component)

20 MW Battery Storage facility located at Hereford.

Inactive • 2021-22 (T-4)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (23 components)
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Needless Hall Farm Toronto Bishop Auckland DL14 7RJ (1 component)

21.6 MW of Battery Storage located in Bishop Auckland.

Inactive • 2021-22 (T-4)
Partridge Hill Farm Austerfield Doncaster DN10 6HA (1 component)

10 MW of Battery Storage located at Doncaster.

Inactive • 2021-22 (T-4)
Rock Farm Ledwych St The Street Ludlow Shropshire SY8 2DS (5 components)

19.6 MW Battery Storage facility located at Rock Farm, Shropshire.

Active • 2021-22 (T-4), 2018-19 (T-1)
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (15 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 16 locations