LIMEJUMP LTD

8 unique locations (177 components)

Active MW: 115.01 MW
Inactive MW: 1062.72 MW
25 Southfield Lingard Lane Stockport SK6 2QN (16 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Aggregate CMU from multiple sources
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Allington EfW, Laverstoke Road, 20/20 Business Park, Allington, Maidstone, Kent, ME16 0LE (25 components)
• Demand reduction
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington Integrated Waste Management Facility,500kT Energy from Waste Plant with c. 36MW electrical output. The auxiliary load is not included in the connection capacity i.e. The export is net. There are 2 different MPAN 1900070394446 and 1900070467983, accumulating to the total output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cargill PLC, Trafford Park, Manchester, M17 1PA (69 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Ervin Amasteel 33KV connection George Henry Road Tipton West Midlands DY4 7BZ (4 components)
• 2.6MW of demand reduction
• Energy facility comprising of reciprocating engine sets.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (7 components)
• 0.5MW of demand reduction
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
• Sizewell B Power Station CMU 2: [SZ2-19] T_SIZB-2 + (50% x T_SIZB-D)
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S803LH (5 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
• Reciprocating engines
Active • 2025-26 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 8 locations