Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

206 unique locations (1991 components) - Page 1 of 9

Active MW: 393.19 MW
Inactive MW: 784.54 MW
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (8 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive •
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (8 components)
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
Inactive •
Whitewall Cottages, Upnor Rd, Upnor, Rochester, ME2 4UZ (5 components)

50 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets

LIMEJUMP LTD Rejected ME2
Inactive •
Weights Farm,Weights Lane,Redditch,B97 6RG (5 components)

4 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery

LIMEJUMP LTD Rejected B97
Inactive •
Weeke Down, Lanham Lane, Winchester, SO22 5QL (4 components)
LIMEJUMP LTD Rejected SO22
Inactive •
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (6 components)

29MW of DSR

DSR LIMEJUMP LTD Not Prequalified
Inactive •
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (8 components)

19 MW of demand reduction

Inactive •
16.37 MW
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (8 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive •
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (5 components)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional DE6
Inactive •
Trent Basin Nottingham NG2 4DS (5 components)

A 0.5MW Lithium Ion Battery based in Nottingham

Inactive •
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (16 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Inactive •
Thornham Lane, Emsworth, PO10 8DD (5 components)

18 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 18*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

LIMEJUMP LTD Rejected PO10
Inactive •
These sites are already generating and exporting to the distribution grid. We are aggregating their output in the context of and FFR Growth programme. (7 components)

Different sites with generation increase that already participate in the FFR growth programme

LIMEJUMP LTD Rejected
Inactive •
The Quarry, Timsbury Manor, Manor Lane, Timsbury,Hampshire SO510NE (5 components)

0.9MW Battery storage located at Hampshire

Battery Storage LIMEJUMP LTD Not Prequalified
Inactive •
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (12 components)
• 0.8 MW of demand reduction
• 800kW/1100kWh Lithium Ion Battery
Inactive •
Stroud Green Lane, Fareham, PO14 2HS (5 components)

40MW of Demand Reduction

Inactive •
Loading map...
Showing 25 locations