LIMEJUMP LTD

154 unique locations (951 components) - Page 1 of 7

Active MW: 393.19 MW
Inactive MW: 784.54 MW
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (8 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive •
Whitewall Cottages, Upnor Rd, Upnor, Rochester, ME2 4UZ (5 components)

50 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets

LIMEJUMP LTD Rejected ME2
Inactive •
Weights Farm,Weights Lane,Redditch,B97 6RG (5 components)

4 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery

LIMEJUMP LTD Rejected B97
Inactive •
Weeke Down, Lanham Lane, Winchester, SO22 5QL (4 components)
LIMEJUMP LTD Rejected SO22
Inactive •
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (6 components)

29MW of DSR

DSR LIMEJUMP LTD Not Prequalified
Inactive •
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (8 components)

19 MW of demand reduction

Inactive •
16.37 MW
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (5 components)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional DE6
Inactive •
Trent Basin Nottingham NG2 4DS (5 components)

A 0.5MW Lithium Ion Battery based in Nottingham

Inactive •
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (16 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Inactive •
Thornham Lane, Emsworth, PO10 8DD (5 components)

18 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 18*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

LIMEJUMP LTD Rejected PO10
Inactive •
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (12 components)
• 0.8 MW of demand reduction
• 800kW/1100kWh Lithium Ion Battery
Inactive •
Stroud Green Lane, Fareham, PO14 2HS (5 components)

40MW of Demand Reduction

Inactive •
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham, B7 5RE (7 components)

1 x 3.5MW natural gas fired turbine + 1 x 4.8MW natural gas fired turbine

Inactive •
Slepe Farm Dorchester Road Lytchett Minster Pool Dorset BH16 6HS (12 components)
• 0.250 MW of demand reduction
• 2MW of DSR
Inactive •
1.72 MW
Seamer Carr Landfill Seamer Scarborough YO12 4QA (5 components)

3MW Battery Storage facility located at Scarborough

Inactive •
Seamer Carr Landfill Seamer Scarborough YO12 4QA (6 components)
• 3 MW of DSR
• 3 MW of demand reduction
Inactive •
2.74 MW