Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

15 unique locations (78 components) - Page 1 of 2

Brotherton Weir, Knottingley West Yorkshire WF11 8HR (9 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Gaywood Farm Hilders Lane Edenbridge TN8 6LD (3 components)

7.5MW Lithium Ion Battery Technology

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Gothic Cottage Farm Mill Rd East Ruston Norwich NR12 9HS (3 components)

A 0.18 MW Storage facility located in Norwich

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land at KWTN Solar Limited at JB Wheaton and Sons Limited, Station Road, S Chard TA20 4QN (3 components)

1.14MW Battery Storage Facility

Battery LIMEJUMP LTD Not Prequalified TA20
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land North of Clayhill Farm Westoning MK45 5JD (5 components)
• 6 MW Battery Storage facility located at Westoning.
• 6MW of demand reduction
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Peel Common Battery Storage, Newgate Ln, Fareham, PO14 1JD (3 components)

20 MW storage battery

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Philip Dennis Foodservice Mullacott Cross Industrial Estate Ilfracombe Devon EX34 8PL (7 components)
• 0.261 MW of DSR
• 0.261 MW of demand reduction
• 0.261MW Storage Battery located in Devon
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Philip Dennis Foodservice Roundswell Business Park Barnstaple Devon EX31 3TD (5 components)
• 3.75 MW storage battery located in Devon
• 3.750 MW of demand reduction
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Plot B at Severn Road Avonmouth BS10 7SE (13 components)
• 10.000MW DSR
• New Build Battery Energy Storage Systems
• The CMU will be formed of multiple individual Batteries. This site is to include a 17MW Battery Energy Storage System (BESS) that can either operate as import or export at will. The 17MW connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
1.36 MW
Questmap Business park Drivers Wharf Northam Road Southampton SO14 0PF (3 components)

1.5MW battery located in Southampton

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 10 locations