Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

181 unique locations (418 components) - Page 3 of 19

Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Stroud Green Lane, Fareham, PO14 2HS (2 components)

40MW of Demand Reduction (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Stoke Rygby Club, ST15 8TL (1 component)

0.5 MW diesel gensets

LIMEJUMP LTD Not Prequalified ST15
Inactive • 2020-21 (T-4)
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (2 components)

10.754 MW CHP Plant with 2 new Gas Turbines (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham, B7 5RE (3 components)

1 x 3.5MW natural gas fired turbine + 1 x 4.8MW natural gas fired turbine (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Slepe Farm Solar, Seven Acres Field, Slepe Farm, Slepe, Nr Poole, Dorset, BH16 6HS (2 components)

1 x 250kW/250kWh Lithium Ion Battery (2)

Battery LIMEJUMP LTD Not Prequalified BH16
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Slepe Farm Dorchester Road Lytchett Minster Pool Dorset BH16 6HS (5 components)
• 2MW of DSR (2)
• 0.250 MW of demand reduction
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 10 locations