Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

LIMEJUMP LTD

209 unique locations (581 components) - Page 20 of 21

Beeches Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (2 components)

0.2MW of turn-down (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Bedhampton Quay, Harts Farm Way, Havant, PO9 1JN (2 components)

29 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets disputes: 29*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions … (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (5 components)

Battery Energy Storage System (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
BATTERSEA POWER STATION LONDON SW11 8AH (8 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.19 MW
Barrasford Pumping Station Barrasford Hexham NE46 4AY (5 components)
• 4MW of DSR (2)
• 0.6MW of turn down
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
0.91 MW
Avely Landfill site, Sandy Lane, Aveley, South Ockendon, Essex, RM15 4XP (2 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Avely Landfill site, Sandy Lane, Aveley, South Ockendon, Essex, RM15 4XP (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Asda Kilmarnock, 10 Queens Drive , Kilmarnock, KA1 3XF (11 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 10 locations