Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

211 unique locations (811 components) - Page 6 of 22

Poplars, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (6 components)
• 1 MW of demand reduction
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Poole Hospital Longfleet R Poole BH15 2JB (3 components)

0.85 MW CHP Located at Poole Hospital

Inactive • 2021-22 (T-4), 2018-19 (T-1)
P.O. Box 81, BILLINGHAM, TS23 1XT (2 components)

This component is a site with load reduction

LIMEJUMP LTD Not Prequalified TS23
Inactive • 2016-17 (TR)
3.39 MW
Plot B at Severn Road Avonmouth BS10 7SE (13 components)
• 10.000MW DSR
• New Build Battery Energy Storage Systems
• The CMU will be formed of multiple individual Batteries. This site is to include a 17MW Battery Energy Storage System (BESS) that can either operate as import or export at will. The 17MW connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
1.36 MW
Plot 168, Block D, Unit 11 Greenwood Way OX11 6DL (8 components)
• Load drop (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.69 MW
PL14 (4 components)

Domestic demand turn down

Active • 2027-28 (T-4), 2024-25 (T-1)
PIERCES FARM PV PALMERS LANE NEAR GRAZELEY BURGHFIELD READING RG7 3AH (3 components)

Battery with 0.25MW and de-rated 0.217

Inactive • 2017-18 (T-1)
Pierces Farm PV Palmers Lane Near Grazeley Burghfield Reading RG7 3AH (3 components)

0.25MW of demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Pierces Farm, Field off Goring Lane, Grazeley Green, Reading, Berkshire. RG7 1LY (3 components)

1 x 250Kw/250KWh Lithium Ion Battery

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Philip Dennis Foodservice Roundswell Business Park Barnstaple Devon EX31 3TD (5 components)
• 3.75 MW storage battery located in Devon
• 3.750 MW of demand reduction
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 10 locations