Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

43 unique locations (164 components) - Page 1 of 5

Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (4 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (5 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Trent Basin Nottingham NG2 4DS (3 components)

A 0.5MW Lithium Ion Battery based in Nottingham

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (10 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
The Quarry, Timsbury Manor, Manor Lane, Timsbury,Hampshire SO510NE (3 components)

0.9MW Battery storage located at Hampshire

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (3 components)

0.8MW demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Stroud Green Lane, Fareham, PO14 2HS (3 components)

40MW of Demand Reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (2 components)

10.754 MW CHP Plant with 2 new Gas Turbines

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Seamer Carr Landfill Seamer Scarborough YO12 4QA (5 components)
• 3 MW of DSR
• 3 MW of demand reduction
• 3MW Battery Storage facility located at Scarborough
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 10 locations