Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

54 unique locations (188 components) - Page 1 of 6

2 Salterns Lane, Burlesdon, Southampton, SO31 8DH (5 components)

38 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 38*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions … (2)

LIMEJUMP LTD Rejected SO31
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Avely Landfill site, Sandy Lane, Aveley, South Ockendon, Essex, RM15 4XP (3 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Avely Landfill site, Sandy Lane, Aveley, South Ockendon, Essex, RM15 4XP

LIMEJUMP LTD Not Prequalified RM15
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Bedhampton Quay, Harts Farm Way, Havant, PO9 1JN (3 components)

29 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets disputes: 29*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

LIMEJUMP LTD Rejected PO9
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Beeches Drayton Manor Farm Alcester Road Stratford Upon Avon CV37 9RQ (3 components)

Turn down CMU

Inactive • 2017-18 (T-1)
Bevercotes Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (3 components)

3 x 1MW / 1.2 MWh BYD Lithium Ion Battery

LIMEJUMP LTD Rejected DN22
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Birds Eye Limited. Whapload Road, Lowestoft, Suffolk NR32 1XQ (5 components)
• 1 x 3.3 MW gas engine CHP plant
• 3.348 MW gas engine CHP plant
Inactive • 2021-22 (T-4), 2018-19 (T-1) ...
BLUE HOUSE FARM DALTON BACK LANE CLAXTON BILLINGHAM DURHAM TS22 5PW (2 components)

Battery CMU - 1.2MW battery with de-rated vol of 1.043

Inactive • 2017-18 (T-1)
Botley Rd, Southampton SO32 1DR (4 components)

25 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 25*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Bourne Park Solar Farm, Bourne Park, Piddlehinton, Dorset. DT2 7TU (2 components)

800kW/ 1100kWh BYD Lithium Ion Battery

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Bristol Port near Land next to Chittening Road,Bristol,BS11 0YU (3 components)

20 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Bristol Port near Land next to Chittening Road,Bristol,BS11 0YU

LIMEJUMP LTD Rejected BS11
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Loading map...
Showing 10 locations