Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LEVELISE LIMITED

273 unique locations (11646 components) - Page 1 of 11

Active MW: 12.88 MW
Inactive MW: 0.00 MW
AB51 (88 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
B71 (15 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
B74 (52 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
B78 (20 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
B80 (6 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
B91 (51 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
B97 (27 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
B98 (24 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
BA1 (42 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
BA11 (36 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
BA12 (27 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
BA2 (59 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
BA22 (52 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
BB10 (10 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
BB2 (40 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
BB9 (13 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
BD16 (22 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
BD21 (6 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
BH21 (71 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
BL5 (23 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
BN2 (57 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
BN21 (14 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
BN3 (68 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
BN8 (18 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
BR3 (41 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
8.23 MW
Loading map...
Showing 25 locations