Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

GRIDBEYOND LIMITED

11 unique locations (57 components)

Active MW: 963.95 MW
Inactive MW: 144.53 MW
Tarmac, Whitefield Road, Bredbury, SK6 2QP (2 components)

7MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
SOUTH CLOSE ROSYTON SG8 5UH (17 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Plot 4, South Kirkby Business Park, Hemsworth, WF9 3TJ (6 components)
• A 20MW New Build gas fuelled generating station.
• A 8MW New Build gas fuelled generating station.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAND ON THE SOUTH OF QUARRY LANE CHICHESTER PO19 8PB (5 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Knowsley Park Way, Hasslingdon, Rossendale, BB4 4HU (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Hollin Bridge Street, Blackburn, BB2 4AY (2 components)

A gas fuelled generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Holden Way, Wainwright Street, Dukinfield, Cheshire SK16 5PL (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Hilfield Lane, Bushey, Hertsmere, Hertforshire, East of England, England (3 components)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Grand Union Canal Walk, Hayes UB3 4DG (4 components)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Davy Road Astmoor Industrial Estate Runcorn WA7 1PZ (9 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Clay Tye Road, Upminster, RM14 3PL (2 components)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Loading map...
Showing 11 locations