GRIDBEYOND LIMITED

21 unique locations (270 components)

Active MW: 814.46 MW
Inactive MW: 294.02 MW
Balance Power Ltd, Customs House, Ipswich Docks, Ipswich, Suffolk, IP3 0DP (6 components)
• CMU Component is 500kVA reciprocating diesel engine.
• Gas reciprocating engines
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
Billingham Site, Haverton Hill Road, Billingham, TS23 1PY (7 components)
• Chemical plant carrying out DSR using load turn-down.
• The CMU component comprises of three 2MW Reciprocating Gas Engines
Active • 2026-27 (T-4), 2020-21 (T-4) ...
Burning Ground Site Kingsnorth Works Industrial Estate Hoo Rochester ME3 9NZ (6 components)
• Gas reciprocating engines
• Little Barford 1 CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2022-23 (T-4) ...
Chickerell Generation Site, Off Radipole Lane, Chickerell, Weymouth, DT4 9RW (8 components)
• 1 x OCGT
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Load reduction on site supported by non-exporting standby generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Coldstore 3, Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (12 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QS (14 components)
• 1.9 MW Gas gen ENER-G 1999
• Torness Power Station CMU 1: [TN1-17] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 2: [TN2-17] T_TORN-2 + (50% x T_TORN-D)
Active • 2024-25 (T-4), 2021-22 (T-4) ...
Errochty Power Station, Tummel Bridge, by Pitlochry, Perthshire, PH16 5DF (23 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• N/A
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2027-28 (T-4), 2023-24 (T-4) ...
Hem Heath, Sir Stanley Matthews Way, Trentham Lakes, Trentham, Stoke on Trent, ST4 8GR (8 components)
• Gas fired reciprocating engine(s)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Howard Road, Park Farm Industrial Estate, Redditch, B98 7SE (7 components)
• Load reduction on site supported by non-exporting standby generation.
• Redditch 20MW Gas Peaker Project
Active • 2026-27 (T-4), 2024-25 (T-1) ...
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (16 components)
• Gas fired reciprocating engines.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (6 components)
• A New Build Battery Energy Storage System
• A New Build Gas fuelled power plant at Capenhurst substation
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2024-25 (T-1), 2023-24 (T-4) ...
Land at Stainburn Road, Stainburn Road, Great Clifton, Derwent Vale, CA14 1TG (11 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Standby generation DRUPs taking site load. No export
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land to the South of Clay Hill off Hamlet Hill CM19 5JR (5 components)
• Bus depot site
• Gas reciprocating engines
• New build power station comprised of multiple reciprocating engines.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH (53 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• CHP engine in a horticultural environment, natural gas, no aux load
• Existing CCGT Unit
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Runcorn site HQ, South Parade, PO Box 9, Runcorn, WA7 4JE (12 components)
• 10MW of onshore wind generation
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Chemical manufacturer
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Sheepbridge Lane, Sheepbridge, Chesterfield, S41 9RX (6 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Diesel and/or gas reciprocating engines.
• This DSR component is an industrial and commercial site which can reduce its imported electricity.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Shirebrook 2 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (8 components)
• 1 x jenbacher JGS616 GS
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Sloy Power Station, Inveruglas, By Arrochar, Argyll, G83 7DP (22 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Genset 3
• The CMU component comprises of three 2MW Reciprocating Gas Engines
Active • 2026-27 (T-4), 2024-25 (T-4) ...
UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST, GLENFIELD CLINIC, GROBY ROAD, LEICESTER, LE3 9QP (10 components)
• A 20MW New Build gas fuelled generating station.
• CHP plant
• New build battery
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Waun y Pound Industrial Estate, Ebbw Vale, South Wales, NP23 6PL (26 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution and gas networks.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 21 locations