FLEXITRICITY LIMITED

22 unique locations (531 components)

Active MW: 686.88 MW
Inactive MW: 2445.49 MW
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (10 components)
• N/A
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
46 Station Road Stokesley Middlesbrough TS9 7AA (16 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Ardagh Glass, Portland Place, Irvine KA12 8JA (16 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build battery
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Asda Chesterfield, Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (9 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on flexible electricity consuming processes
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
2.38 MW
Asda Rawtenstall, Lower Mill St. Mary's Way BB4 8EL (7 components)
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.43 MW
Asda Thurnscoe, 144 Houghton Road Thurnscoe, Barnsley, S630JZ (11 components)
• Battery Storage Facilty
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.80 MW
Beach Esplanade, Aberdeen AB24 5NR (12 components)
• Battery Storage Plant
• CMU consisting of multiple reciprocating engines and alternators
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2028-29 (T-4), 2024-25 (T-4) ...
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
• Hamms Hall - Existing Site CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Commercial Road, Wolverhampton, WV1 3RD (5 components)
• District heating implementation with one asset 1MW and no auxiliary load
• battery storage
Active • 2024-25 (T-4), 2021-22 (T-4) ...
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (37 components)
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Deansford Lane, DY10 4NB (15 components)
• A new build 11MW battery storage system
• Battery system installed at Emirates Stadium
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.45 MW
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (59 components)
• Keadby 1 CCGT
• Keadby GT3
• Single combined cycle gas turbine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (46 components)
• Connah's Quay PS Unit 2 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (15 components)
• BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2021-22 (T-4) ...
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ (25 components)
• 1,000MW electricity interconnector between GB and Belgian transmission systems. The Nemo Link interconnector will consist of subsea and underground cables connected to a converter station in each country, which will allow electricity to flow in either direction between the two countries. Nemo Link® will build the converter station on an 8 hectare site, formerly occupied by the Richborough Power Station, which now forms part of the Richborough Energy Park proposals. A similar converter station will be built in the industry zone Herdersbrug in Bruges.
• Battery energy storage unit
• Two gas CHP in a horticultural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Michelin Tyre Company Limited, Campbell Road, Stoke On Trent, Staffordshire, ST4 4EY (16 components)
• A gas engine CHP site providing hot water to an industrial unit
• CMU consisting of multiple reciprocating engines and alternators
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Neachley Ln, Shifnal TF11 8PQ (15 components)
• Gas peaking reciprocating engine
• Load reduction on site supported by non-exporting standby generation.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.60 MW
School Road, Aberdeen AB24 1TU (19 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• bus depot site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 5 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (12 components)
• Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.
• Load curtailment
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Westexe, Tiverton, Devon, EX16 5LL (8 components)
• 2026 kW CHP unit
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2023-24 (T-1) ...
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 22 locations