Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

206 unique locations (800 components) - Page 9 of 21

Asda Cheltenham, Hubble Road, Cheltenham, GL51 0EX (3 components)
• Load reduction (2)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
7.58 MW
Asda Dyce, Cairnton Road, Boyndie, Banffshire, AB45 2LR (8 components)
• Standby diesel generator that reduces site load when generating. (2)
• Standby generation
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
6.92 MW
Asda Eastlands, 77 Oldham Road, Manchester, Lancashire M4 5AA (1 component)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

Inactive • 2021-22 (T-4)
34.54 MW
Asda Far Cotton, Kings Park Road, Moulton Park, Northampton, NN3 6NW (6 components)
• Load reduction on site via standby generation (2)
• Load curtailment on site and standby generation
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
4.56 MW
Asda Farnborough, Portsmouth Rd, Frimley, Surrey GU16 7UJ (7 components)
• Standby generation sub-metered taking site load (2)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.58 MW
Asda Fullarton Express Petrol, 125 Fullarton Drive, Glasgow East Investment Park GLASGOW G32 8FG (6 components)
• Load curtailment via standby generation exporting excess (2)
• Load reduction on-site and standby generation
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
4.56 MW
Asda Fulwood, BOWLAND VIEW, FULWOOD, PRESTON, LANCASHIRE, PR2 5QT (1 component)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

Inactive • 2021-22 (T-4)
3.89 MW
Asda Fulwood, Bowland View Preston PR2 5QT (2 components)

Combination of load curtailment and standby generation (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
4.56 MW
Asda Fulwood, Bowland View Preston PR3 1LR (4 components)

Combination of load curtailment and standby generation (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
3.86 MW
Loading map...
Showing 10 locations