Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

1028 unique locations (7947 components) - Page 1 of 42

Active MW: 991.08 MW
Inactive MW: 2141.30 MW
Wytch Farm, Wareham BH20 5JR (7 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (5 components)
• Two duration battery storage
• Two hour duration battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (10 components)

3 x 1.6MW POSGU (standby generation)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (7 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (8 components)
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire. Metering of output is Net of auxillary load.
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• ... and 1 more unique description
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Wichling Pumping Station, Syndal Bottom, Sittingbourne, ME9 0BL (7 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Whitwell Energy Park, Southfield Lane, Whitwell, Derbyshire, S80 3LH (8 components)
• 1 x 2MW gas gen sets at Whitwell Energy Park.
• Gas reciprocating engines as the generating unit.
Active • 2027-28 (T-4), 2020-21 (T-4) ...
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (12 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Wheldale 1 Wheldale Generation Site Wheldale Road Castleford West Yorkshire WF10 2RR (6 components)
• 2x Jenbacher J620 & 1x Jenbacher J616
• Gas reciprocating engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (4 components)
• New build generating CMU component - Whaddon Farm BESS
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park.
Active • 2027-28 (T-4), 2024-25 (T-1)
West Road North, Cross Green, Leeds, West Yorkshire, LS10 1RR (2 components)
• Gas engines in a peaking plant environment
• New gas engines in a peaking plant environment, servicing power generation and DSR.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (8 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Veolia, Bridges Rd, Ellesmere Port, Cheshire, CH65 4EQ (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Vause Farm, Town Ln, Charnock Richard, Chorley PR7 5HQ (3 components)
• New build 10no. twin gas generators with 10no. transformers, switchgear and ancillary requirements.
• New build 9no. twin gas generators with 9no. transformers, switchgear and ancillary requirements.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Vacant land off Middleton Road, Morecambe, Lancaster, LA3 3NT (1 component)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Inactive • 2021-22 (T-4)
Uskmouth Power Station, West Nash Road, Nash, Newport, Gwent NP18 2BZ (11 components)
• A series of diesel generators although other fuels are also being considered.
• The CMU is a coal-fired set in the Uskmouth power station. This is a mothballed set for which TEC may be sought. As the connection agreement shows, the site has the CEC to export to this quantity, but it will be a matter of securing TEC (of some form) if this set is to come back on the bars.
• The CMU is a coal-fired set in the Uskmouth power station. This is one of the 2 active units.
• ... and 2 more unique descriptions
LIMEJUMP LTD Not Prequalified NP18
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Units 1 and 2 - Fen Street, Magna Park, Milton Keynes, MK17 8EW (7 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Units 1-4, 730 London Road, West Thurrock, Essex, RM20 3NL (7 components)
• 20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• gas fired reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Unit 2 Northside, Freightliner Road, Brighton Road Industrial Estate, Hull HU3 4UW (1 component)

10 x 2MW new recip gas engines in a peaking plant environment, with a planned 15+ year lifespan. The installation and O&M put in place will meet the extended years …

Inactive • 2022-23 (T-4)
"Unit 1 Carter Square, Uttoxeter, ST14 8EU" (4 components)

Load curtailment (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (10 components)
• Water Source Heat Pumps at 1748KW each (x2)
• Water source heat pumps at 1748kW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.31 MW
Loading map...
Showing 25 locations