Goudhurst Pumping Station, Bluecoats Lane, Cranbrook, TN17 1HB (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (11 components)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• New CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.56 MW
HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE (3 components)

CHP engines to be installed at: HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE

Active • 2025-26 (T-4), 2022-23 (T-1)
Hallsville Quarter District Heat Network, Rathbone Street, London, E16 1GU (3 components)

1 x 1.2 MW Gas CHP engine, for the sole purpose of generating electricity for grid export.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.18 MW
Harbour House, Marine Parade Dover Kent CT17 9BU (5 components)
• Multiple POSGUs (standby diesel generators).
• Sixteen POSGUs (standby diesel generators).
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (9 components)
• Water source Heat Pumps at 1883KW each
• Water source Heat Pumps at 1883KW each - located at Horticultural site
• Water source heat pump at 1883kW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Hempstead Lane, Hempstead, Gloucester GL2 5LF (12 components)
• Load curtailment at site
• Load curtailment at site with standby generation exporting
• Standby generation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
High Street Waterham Kent ME13 9EJ (3 components)

6 CHP engines of 1.5MW each. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
High Street, Waterham, nr Faversham, Kent ME13 9EJ (11 components)
• 6 CHP engines horticultural environment with no auxiliiary load
• Two of six CHP engines horticultural environment with no auxiliiary load
Active • 2027-28 (T-4), 2025-26 (T-1) ...
18.54 MW
Holditch Power Station Holditch Road Lymedale Business Park Newcastle under Lyme ST5 9JA (4 components)

Three reciprocating engines each with 2.66MW capacity. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)