Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

852 unique locations (10283 components) - Page 1 of 35

Active MW: 991.08 MW
Inactive MW: 2141.30 MW
100 Montifichet Road, Westfield, Stratford E20 1GR (60 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 MW as per the 3 highest export peaks
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
Active • 2028-29 (T-4), 2027-28 (T-4) ...
172-174 Rye Lane PeckhamLondon, London, SE15 4NB (11 components)
• EV charging at residential premises
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
4.80 MW
17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SS (2 components)

2 x gas fired CHP generators located at a horticultural site.

Active • 2028-29 (T-4), 2024-25 (T-4)
18-20 Langthwaite Rd, South Kirkby, Pontefract WF9 3AP (5 components)
• Load reduction
• Load shedding
Active • 2025-26 (T-4), 2022-23 (T-4) ...
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (15 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (19 components)
• Battery Storage Plant
• Load reduction on site supported by non-exporting standby generation.
• Reciprocating genset in acoustic enclosure
Active • 2025-26 (T-4), 2023-24 (T-4) ...
2 Engineers Way, Wembley, Middlesex, HA9 0JS (10 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
301 Camberwell New Rd, Camberwell, London, SE5 0TF (14 components)
• 1.26MW Battery Storage located at Abellio Walworth depot
• Bus depot site
• Load reduction on site supported by non-exporting standby generation.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (16 components)
• 1.200MW BESS
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• District heating implementation of two gas CHP engines with no auxilliary load
Active • 2026-27 (T-4), 2025-26 (T-4) ...
46 Station Road Stokesley Middlesbrough TS9 7AA (16 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA (4 components)

New CHP engine to be installed at 4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA

Active • 2025-26 (T-4), 2022-23 (T-1)
9 Handyside St, Kings Cross, London N1C 4BH (16 components)
• Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
• Gas fired reciprocating engines.
Active • 2027-28 (T-4), 2024-25 (T-4) ...
ABBOTSHAUGH RESERVE POWER FACILITY, ABBOTTS ROAD, FALKIRK, FK2 7XU (1 component)

Front of the meter 10 x 2MW Gas Reciprocating Engines installed to generate power and export to the local Distribution Network.

Active • 2025-26 (T-4)
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
ACS&T - Tewkesbury - Site 1, Newtown Trading Est/Green La, Tewkesbury GL20 8HD (15 components)
• CHP unit
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
ACS&T - Tewkesbury - Site 2, Newtown Trading Est/Green La, Tewkesbury GL20 8HD (14 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Aldergrove Nursery, Marsh Road, Southport PR9 8DX (7 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Two engines, one of 2.679MW and one of 2.004MW to be supporting a horticultural environment. Primary fuel type = natural gas
Active • 2027-28 (T-4), 2020-21 (T-4) ...
Ardagh Group - Barnsely Site 1, Burton Road, Monk Bretton South Yorkshire S71 5RP (15 components)
• Gas-fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Ardagh Group - Barnsely Site 2, Burton Road, Monk Bretton South Yorkshire S71 5RP (18 components)
• 3.6MW of demand reduction
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Asda Abbey Park, Abbey Park London Road CV3 4AR (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.03 MW
Asda Aberdare, Riverside Retail Park, Aberdare, CF44 0AH (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.80 MW
Asda Aberdeen Beach, Unit 1 Beach Boulevard Retail Park Links Road AB24 5EZ (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.40 MW
Asda Accrington, Hyndburn Road BB5 1QR (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.43 MW
Asda ADC, Foxbridge Way, Normanton, WF6 1TL (12 components)
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
• Reciprocating genset in acoustic enclosure
Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.39 MW
ASDA Adel, Holt Road, Leeds, LS16 7RY (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.80 MW
Loading map...
Showing 25 locations