FLEXITRICITY LIMITED

206 unique locations (800 components) - Page 5 of 21

Ide Hill Road, Bough Beech, Edenbridge TN8 7PJ (4 components)

Standby generation

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Holditch Power Station Holditch Road Lymedale Business Park Newcastle under Lyme ST5 9JA (4 components)

Three reciprocating engines each with 2.66MW capacity. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
High Street Waterham Kent ME13 9EJ (3 components)

6 CHP engines of 1.5MW each. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Harbour House, Marine Parade Dover Kent CT17 9BU (5 components)
• Multiple POSGUs (standby diesel generators).
• Sixteen POSGUs (standby diesel generators).
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (11 components)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• New CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.27 MW
Goudhurst Pumping Station, Bluecoats Lane, Cranbrook, TN17 1HB (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Gogar Station Road, Gogarburn Edinburgh EH12 9SB (2 components)
• Four POSGUs (standby diesel generators) each having 1.4MW capacity.
• Four POSGUs (standby generators) each having 1.4MW capacity.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Gogar Station Road, Gogarburn Edinburgh EH12 1HQ (4 components)

Four POSGUs (standby diesel generators) each having 1.4MW capacity.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Godmersham Pumping Station, Canterbury Road, Canterbury, CT4 7DP (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Glebe Farm, Grunters Grange, East Keal, Spilsby Lincs PE23 4AY (3 components)

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 10 locations