Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

656 unique locations (5467 components) - Page 5 of 66

Galley Hill Road Waltham Abbey Essex EN9 2AG (13 components)

Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
1.28 MW
Dunswell Lane, Cottingham, Hull HU16 4JT (2 components)

1 x 1,400kW gas fired CHP at a horticultural site. Maximum Export capacity of connection agreement is 1,400MW. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
1.91 MW
Drakemyre, Dalry KA24 5JJ (24 components)

Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (3)

Active • 2028-29 (T-4), 2026-27 (T-4) ...
40.87 MW
Deansford Lane, DY10 4NB (12 components)

Load reduction on site supported by non-exporting standby generation. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Dalmarnock, 120 Cotton Street, Glasgow, G40 4HU (4 components)

CHP at a water treatment works in Glasgow. (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Crown Point Glasshouse, Kirby Road, Norwich, NR14 7DU (2 components)

3No 1.2MW gas CHP providing power, heat and CO2 in a horticultural environment (2)

Active • 2024-25 (T-4), 2023-24 (T-4)
Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (8 components)

Load reduction on flexible electricity consuming processes (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Coldstore 3, Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (8 components)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation. (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
BRADWELL DBS PUMPING STATION, STRETFIELD, BRADWELL, HOPE VALLEY, DERBYSHIRE, S33 9JT (5 components)

Load reduction on site supported by non-exporting standby generation. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Bowland View, Fulwood, Preston, Lancashire PR2 5QT (8 components)

Standby generation (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 10 locations