Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

119 unique locations (440 components) - Page 5 of 12

Godmersham Pumping Station, Canterbury Road, Canterbury, CT4 7DP (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Glebe Farm, Grunters Grange, East Keal, Spilsby Lincs PE23 4AY (3 components)

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements (2)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
George Square Charles St Lane EH8 9AG (2 components)

CHP generating for site load, which exceeds generating capacity. No aux load. (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Frimley Park Hospital, Portsmouth Road, GU16 7UJ (3 components)
• CHP generating to cover site load, which exceeds generating capacity. No aux load. (2)
• CHP generating in NHS hospital. No aux load.
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Energy Centre, Quarryfield Road, Gateshead NE8 3BE (10 components)
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
• 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
• CHP in a district heating environment, providing heat & electricity to local area and exporting excess.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Elphinstone Research Centre, Tranent EH33 2NE (4 components)

Load drop by on-site generation (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Elmer Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (5 components)

Combination of load curtailment and standby generation (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Easter Bush Energy Centre, Bush Farm Road, Roslin, Midlothian, EH25 9RG (4 components)

Two CHP, generating for site load which exceeds generating capacity. No aux load. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Dunswell Road, Cottingham, Hull HU16 4JT (3 components)

Two CHP engines, 1.94MW and 1.46MW (total 3.4MW) in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Dock Yard Rd, Ellesmere Port, CH65 4EG (7 components)
• BtM storage providing standby capacity (2)
• BtM storage as standby generation, non-exporting
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 10 locations