Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

894 unique locations (11789 components) - Page 35 of 36

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
ASDA Chelmsford, Chelmer Village Centre, Chemsford, CM2 6RE (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
4.80 MW
ASDA Chatham, 387 Maidstone Road , Chatham, ME5 9SE (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Inactive •
4.80 MW
ASDA Carcroft, High Street Carcroft, Doncaster, DN6 8DN (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Inactive •
4.80 MW
ASDA Canterbury, Sturry Road, Canterbury, CT1 1DG (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2019-20 (T-1), 2020-21 (T-4) ...
4.80 MW
ASDA Cannock, Avon Road , Cannock, WS11 1LH (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
4.80 MW
ASDA Burton On Trent, Octagon Centre Orchard Street, Burton On Trent, DE14 3TN (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
0.02 MW
ASDA Burnden Park, Manchester Road , Bolton, BL3 2QS (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
4.80 MW
ASDA Brynmawr, Lakeside Retail Park Nantyglow, Ebbw Vale, NP23 4SL (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
4.80 MW
ASDA Bromborough, Welton Road Croft Business Park, Bromborough, CH62 3QP (11 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
Inactive •
4.28 MW
ASDA Brighton Marina, Brighton Marina, Brighton, BN2 5UT (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Inactive •
4.80 MW
ASDA Brighton Hollingbury, Unit1 Crowhurst Road , Brighton, BN1 8AS (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
4.80 MW
Asda Boston, Sleaford Road PE21 8EQ (7 components)
• Load curtailment from refridgeration
• Load drop
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2021-22 (T-4), 2022-23 (T-1) ...
8.43 MW
ASDA Blantyre, Clydeview Shopping Centre Glasgow Road, Glasgow, G72 0AQ (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
4.80 MW
ASDA Blackwood, High Street, Blackwood, NP12 0NT (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Inactive •
4.80 MW
ASDA Blackpool, Cherry Tree Road, Blackpool, FY4 4QH (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
4.80 MW
ASDA Bearsden, 80 Milngavie Road Bearsden, Glasgow, G61 2TX (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2019-20 (T-1), 2020-21 (T-4) ...
4.80 MW
ASDA Basildon, Heron Retail Park Miles Grey Road, Basildon, SS14 3AS (14 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2021-22 (T-4), 2022-23 (T-1) ...
4.80 MW
ASDA Barry, Ffordd Y Mileniwm, Barry, CF62 5AT (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
0.02 MW
ASDA Barnsley, Old Mill Lane , Barnsley, S71 1LN (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
4.80 MW
ASDA Barking, Genoa Building, Barking, IG11 8FJ (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2020-21 (T-4), 2022-23 (T-1) ...
4.80 MW
ASDA Ayr, Liberator Drive , Ayr, KA8 9BF (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Inactive •
4.80 MW
4.75 MW
ASDA Aintree, Ormskirk Road Aintree, Liverpool, L10 3LN (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
Inactive •
4.28 MW
Aldergrove Nursery, Marsh Road, Southport PR9 8DX (7 components)

Two engines, one of 2.679MW and one of 2.004MW to be supporting a horticultural environment. Primary fuel type = natural gas

Inactive •
ABBOTSHAUGH RESERVE POWER FACILITY, ABBOTTS ROAD, FALKIRK, FK2 7XU (2 components)

Front of the meter 10 x 2MW Gas Reciprocating Engines installed to generate power and export to the local Distribution Network.

Inactive •
Loading map...
Showing 25 locations