Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

FLEXITRICITY LIMITED

119 unique locations (440 components) - Page 3 of 12

Ottringham Road Keyingham Hull North Humberside HU12 9RX (7 components)

Eight gas CHP engines for commercial horticultural use with no auxilliary load (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Musgrove Park Hospital, Parkfield Drive, Taunton TA1 5DA (5 components)

2 x POSGU (each 1MW) (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Minerva Road, Farnworth, Bolton, BL4 0JR (3 components)
• CHP generating for site load, which exceeds generating capacity. No aux load. (2)
• CHP generating in NHS hospital. No aux load.
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Melrow Nursery, Rydings Lane, Southport, Merseyside PR9 8EB (3 components)

One 2.679MW gas CHP engine in a new energy centre supporting a horticultiral environment. Primary fuel type = natural gas (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Manchester Mail Centre, 77 Oldham Road, Manchester, Lancashire M4 5AA (3 components)

Standby generation (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Main Street, Burstwick, Hull, HU12 9EA (3 components)

Two engines of 2.7MW each and one of 1.9MW, all CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Main Street, Brough, East Yorkshire HU15 2PR (3 components)

Two assets 1.4MW and 1.9MW, both CHP engine in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
London Road, Redhill, Surrey RH1 1LJ (2 components)

2 x POSGU , each 0.8MW (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land on Jameston Farm, Dalry Ayrshire KA24 4EY (1 component)

Array of lithium ion batteries in a power generation environment, proving power to National Grid. Change of use of land from agricultural to new build generation.

Inactive • 2022-23 (T-4)
Land off Station lane, Monkton Mains, Wormald Green, Harrogate HG3 3QA (3 components)

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements (2)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 10 locations