Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

FLEXITRICITY LIMITED

656 unique locations (5467 components) - Page 2 of 66

School Road, Aberdeen AB24 1TU (14 components)

District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.22 MW
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (10 components)

One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load. (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
2.06 MW
Saltend Lane, HULL, HU12 8PP (23 components)
• Load reduction (2)
• Load reduction on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (9 components)

Two gas CHP in a horticultural environment with no aux load (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.02 MW
Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH (27 components)
• One of three CHP in a horticultural environment (2)
• One of three CHP in a horticultural environment.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.69 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (11 components)

CHP engine in a horticultural environment, natural gas, no aux load (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.82 MW
Plot 5, Barrow Man Road, Birchington Kent CT7 0AX (8 components)

One CHP engine in a horticultural environment with no auxilliary load. (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.97 MW
Plot 4 Thanet Earth, Barrow Man Road Birchington Kent CT7 0AX (7 components)

Two CHP gas engines in commercial horticultural environment with no auxilliary load (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.96 MW
Plot 3, Barrow Man Road, Birchington CT7 0AX (13 components)

Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess. (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.73 MW
Loading map...
Showing 10 locations