Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

206 unique locations (800 components) - Page 11 of 21

Asda Old Kent Road, Bankside 2 & 3, 90-100 Southwark Street, London, SE1 0SW (5 components)
• Standby generation DRUPs taking site load. No export (2)
• Standby generation DRUPS taking site load, non-exporting
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
2.93 MW
Asda Park Royal, Paddington Green Campus, London, W2 1NB (5 components)

Load reduction on site supported by non-exporting standby generation. (3)

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
1.17 MW
Asda Ponders End, Iceland Foods 5 Solar Way Innova Park Brimsdown Enfield EN3 7XY (5 components)

Mix of load reduction and standby generation (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
5.09 MW
Asda Queensferry, Iceland Foods Second Avenue Deeside Industrial Park Deeside Flintside CH5 2NW (5 components)

Mix of load reduction and standby generation (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
5.09 MW
Asda Rochdale, Hanson Place, Gorrells Way, Rochdale, OL11 2NQ (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
0.97 MW
Asda Rotherham, Riverside House, Main Street, Rotherham S60 1AE (6 components)

Load reduction and generation via standby assets (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
8.42 MW
Asda Rugby, Centre Bailey Road,Central Park, Rugby CV23 0PD (2 components)

Mix of load curtailment and standby generation (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
2.38 MW
Asda Rugby, entre Bailey Road,Central Park, Rugby CV23 0PD (5 components)
• Load curtailment & standby generation (2)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
5.80 MW
Asda, Scalley Way Raunds NN9 6EQ (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 10 locations