Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

892 unique locations (10907 components) - Page 31 of 36

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
Galleon Blvd, Dartford, DA2 6QA (2 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2021-22 (T-4), 2022-23 (T-4)
Galley Hill Road Waltham Abbey Essex EN9 2AG (25 components)
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2023-24 (T-1), 2023-24 (T-4) ...
GCHQ, Hubble Road, Cheltenham, GL51 0EX (7 components)

Load reduction

Inactive • 2017-18 (T-1), 2020-21 (T-4)
George Square Charles St Lane EH8 9AG (5 components)

CHP generating for site load, which exceeds generating capacity. No aux load.

Inactive • 2019-20 (T-1), 2022-23 (T-4)
Glebe Farm, Grunters Grange, East Keal, Spilsby Lincs PE23 4AY (5 components)

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements

Inactive • 2022-23 (T-3), 2022-23 (T-4) ...
Godmersham Pumping Station, Canterbury Road, Canterbury, CT4 7DP (8 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
Gogar Station Road, Gogarburn Edinburgh EH12 1HQ (7 components)

Four POSGUs (standby diesel generators) each having 1.4MW capacity.

Inactive • 2017-18 (T-1), 2020-21 (T-4)
Gogar Station Road, Gogarburn Edinburgh EH12 9SB (2 components)
• Four POSGUs (standby diesel generators) each having 1.4MW capacity.
• Four POSGUs (standby generators) each having 1.4MW capacity.
Inactive • 2021-22 (T-4), 2022-23 (T-4)
Goudhurst Pumping Station, Bluecoats Lane, Cranbrook, TN17 1HB (8 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (17 components)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• New CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2023-24 (T-4), 2024-25 (T-4) ...
HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE (6 components)

CHP engines to be installed at: HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE

Active • 2022-23 (T-1), 2025-26 (T-4)
Hallsville Quarter District Heat Network, Rathbone Street, London, E16 1GU (2 components)

1 x 1.2 MW Gas CHP engine, for the sole purpose of generating electricity for grid export.

Active • 2025-26 (T-1), 2028-29 (T-4)
Hanson Place, Gorrells Way, Rochdale, OL11 2NQ (7 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
Harbour House, Marine Parade Dover Kent CT17 9BU (8 components)
• Multiple POSGUs (standby diesel generators).
• Sixteen POSGUs (standby diesel generators).
Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (39 components)

load curtailment at site

Active • 2022-23 (T-3), 2022-23 (T-4) ...
11.07 MW
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (12 components)
• Water source Heat Pumps at 1883KW each
• Water source Heat Pumps at 1883KW each - located at Horticultural site
• Water source heat pump at 1883kW each
Active • 2023-24 (T-4), 2025-26 (T-1) ...
14.00 MW
Hempstead Lane, Hempstead, Gloucester GL2 5LF (15 components)
• A standby diesel generator on a waste water treatment works.
• A standby diesel generator on a waster water treatment works.
• Standby generation
Active • 2022-23 (T-3), 2022-23 (T-4) ...
14.00 MW
Hereford - Chelthenham and Worcester HR4 9AA (1 component)

Commercial sites

Active • 2024-25 (T-1)
2.04 MW
High Dike, Grantham NG32 3QD (8 components)

Load reduction on flexible electricity consuming processes

Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
High Street, Edinburgh, EH33 1LP (18 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2022-23 (T-1), 2023-24 (T-1) ...
4.80 MW
High Street Waterham Kent ME13 9EJ (6 components)

6 CHP engines of 1.5MW each. Primary fuel type = Natural Gas

Inactive • 2017-18 (T-1), 2020-21 (T-4)
High Street, Waterham, nr Faversham, Kent ME13 9EJ (14 components)
• 6 CHP engines horticultural environment with no auxiliiary load
• Two of six CHP engines horticultural environment with no auxiliiary load
Active • 2023-24 (T-1), 2023-24 (T-4) ...
Holditch Power Station Holditch Road Lymedale Business Park Newcastle under Lyme ST5 9JA (8 components)

Three reciprocating engines each with 2.66MW capacity. Primary fuel type = Natural Gas

Inactive • 2017-18 (T-1), 2020-21 (T-4)
Hubble Road, Cheltenham, GL51 0EX (6 components)
• Load reduction
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2021-22 (T-4), 2022-23 (T-4)
HUMBERSTONE ROAD, GRIMSBY, DN32 8HW (6 components)

CHP engines to be installed at HUMBERSTONE ROAD, GRIMSBY, DN32 8HW

Active • 2022-23 (T-1), 2025-26 (T-4)
Loading map...
Showing 25 locations