Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

847 unique locations (7035 components) - Page 12 of 85

Buckland Gardens, Broadway, Worcestershire WR12 7LY (7 components)
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• One asset 1.935MW CHP engine in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Bramhall Moor Ln, Pepper Rd, Hazel Grove, Stockport SK7 5BJ (3 components)

CHP exporting to a private wire network in a manufacturing environment.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
BRADWELL DBS PUMPING STATION, STRETFIELD, BRADWELL, HOPE VALLEY, DERBYSHIRE, S33 9JT (5 components)

Load reduction on site supported by non-exporting standby generation. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.26 MW
Bowland View, Fulwood, Preston, Lancashire PR2 5QT (8 components)

Standby generation

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Bower Building, University of Glasgow, University Avenue, G12 8QQ (3 components)

CHP generator exporting to private wire network at the University of Glasgow.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Bletcham Way, Fennylock, Milton Keynes, Bucks MK1 1QA (7 components)

2 x 0.8MW POSGU (standby generation).

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Bewl Bridge Treatment Works, Bewl Bridge Lane, Lamberhurst, Tunbridge Wells, TN3 8JH (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Beach Esplanade, Aberdeen AB24 5NR (11 components)

District heating implementation with one asset 1MW and no auxiliary load

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.91 MW
Loading map...
Showing 10 locations