FLEXITRICITY LIMITED

11 unique locations (127 components)

Active MW: 991.08 MW
Inactive MW: 2141.30 MW
100 Montifichet Road, Westfield, Stratford E20 1GR (60 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
ABBOTSHAUGH RESERVE POWER FACILITY, ABBOTTS ROAD, FALKIRK, FK2 7XU (1 component)

Front of the meter 10 x 2MW Gas Reciprocating Engines installed to generate power and export to the local Distribution Network.

Active • 2025-26 (T-4)
ACS&T - Tewkesbury - Site 1, Newtown Trading Est/Green La, Tewkesbury GL20 8HD (15 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Elm Court Estate, Capstone Road, Gillingham, ME7 3JQ (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4)
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (6 components)
• A New Build Battery Energy Storage System
• A New Build Gas fuelled power plant at Capenhurst substation
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land at Union Street, Masbrough, Rotherham, S61 1AA (9 components)

Reciprocating genset in acoustic enclosure

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land off Merseyton Road, Ellesmere Port, Cheshire West and Chester, CH65 2JE (2 components)

A new build, gas fueled generation station

Active • 2026-27 (T-4), 2025-26 (T-4)
Markham Lane Duckmanton Chesterfield S44 5HS (6 components)
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
On land off Nairn Road, Deans Industrial Estate, Livingston, EH54 8AY (6 components)

A new build, gas fuelled generation station.

Active • 2025-26 (T-4), 2024-25 (T-4) ...