Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

11 unique locations (73 components) - Page 1 of 2

17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SS (3 components)

2 x gas fired CHP generators located at a horticultural site. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
5.46 MW
2 Engineers Way, Wembley, Middlesex, HA9 0JS (6 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.39 MW
Dunswell Lane, Cottingham, Hull HU16 4JT (2 components)

1 x 1,400kW gas fired CHP at a horticultural site. Maximum Export capacity of connection agreement is 1,400MW. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
1.91 MW
Hallsville Quarter District Heat Network, Rathbone Street, London, E16 1GU (3 components)

1 x 1.2 MW Gas CHP engine, for the sole purpose of generating electricity for grid export. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.18 MW
High Street, Waterham, nr Faversham, Kent ME13 9EJ (10 components)

6 CHP engines horticultural environment with no auxiliiary load (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
13.39 MW
Magna House, Stafford Park 3, Telford, Shropshire, TF3 3BH (4 components)

One CHP, generating for site load which exceeds generating capacity. No aux load. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
3.87 MW
Northmoor Lane, Cottingham, Hull HU16 4JN (6 components)

one CHP (1.9MW rating) in a horticulatural environment with no aux load (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.20 MW
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.02 MW
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (10 components)

One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load. (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
2.06 MW
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (6 components)

Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.89 MW
Loading map...
Showing 10 locations