Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

38 unique locations (343 components) - Page 3 of 4

Glebe Farm, Grunters Grange, East Keal, Spilsby Lincs PE23 4AY (3 components)

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Galley Hill Road Waltham Abbey Essex EN9 2AG (16 components)
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.50 MW
Elphinstone Research Centre, Tranent EH33 2NE (4 components)
• Load drop
• Load drop by on-site generation
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Easter Bush Energy Centre, Bush Farm Road, Roslin, Midlothian, EH25 9RG (5 components)

Two CHP, generating for site load which exceeds generating capacity. No aux load.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Dock Yard Rd, Ellesmere Port, CH65 4EG (8 components)
• BtM storage as standby generation, non-exporting
• BtM storage providing standby capacity
• BtM storage/standby generation; non exporting
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Crown Point Glasshouse, Kirby Road, Norwich, NR14 7DU (2 components)

3No 1.2MW gas CHP providing power, heat and CO2 in a horticultural environment

Active • 2024-25 (T-4), 2023-24 (T-4)
Coldstore 3, Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (9 components)
• Load drop.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
BRADWELL DBS PUMPING STATION, STRETFIELD, BRADWELL, HOPE VALLEY, DERBYSHIRE, S33 9JT (5 components)

Load reduction on site supported by non-exporting standby generation. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.26 MW
Barrow Man Road Birchington Kent CT7 0AX (10 components)
• Two CHP engines in horticultural environment with no auxilliary load
• Two 2.7MW CHP engines. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.73 MW
Asda Skelton, Cleveland Potash Limited, Boulby Mine, Saltburn-by-the-Sea TS13 4UZ (3 components)
• Load drop capability at mine shaft site located at Boulby Mine, Saltburn-by-the-Sea TS13 4UZ (2)
• Load curtailment
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
3.45 MW
Loading map...
Showing 10 locations