Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

679 unique locations (9134 components) - Page 1 of 28

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
Slough Nurseries, Rochford Gardens, Uxbridge Road, Slough SL2 5NU (6 components)

One 2MW gas CHP engine in a horticultural environment

Active • 2027-28 (T-4), 2024-25 (T-1) ...
Seafield Road, Edinburgh EH6 7LQ (23 components)

Standby generation, submetered, taking site load

Active • 2023-24 (T-1), 2022-23 (T-4) ...
1.99 MW
Roundswell Business Park, Barnstable, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon.

Active • 2023-24 (T-1)
Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH (49 components)
• One of three CHP in a horticultural environment
• One of three CHP in a horticultural environment.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Northmoor Lane, Cottingham, Hull HU16 4JN (10 components)

one CHP (1.9MW rating) in a horticulatural environment with no aux load

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Newhouse Farm Ind Est, Chepstow, NP16 6UD (6 components)
Active • 2025-26 (T-4), 2024-25 (T-1) ...
High Street, Waterham, nr Faversham, Kent ME13 9EJ (14 components)
• 6 CHP engines horticultural environment with no auxiliiary load
• Two of six CHP engines horticultural environment with no auxiliiary load
Active • 2027-28 (T-4), 2025-26 (T-1) ...
High Street, Edinburgh, EH33 1LP (18 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.80 MW
Galley Hill Road Waltham Abbey Essex EN9 2AG (25 components)
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Drakemyre, Dalry KA24 5JJ (44 components)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Bush Estate, Penicuik EH26 0QA (11 components)
• Load reduction on site supported by standby generation
• Standby generation reducing load
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.97 MW
Bowland View, Fulwood, Preston, Lancashire PR2 5QT (13 components)

Standby generation

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.25 MW
ASDA Wrexham, Holt Road, Wrexham, LL13 8HL (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
4.80 MW
Asda Worsbrough, Thomas Street , Worsbrough, S705AU (9 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
4.80 MW
ASDA Woking Sheerwater, Forsyth Road Sheerwater, Woking, GU21 5SE (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
0.02 MW
ASDA Wheatley, London Road, Oxford, OX33 1YZ (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
4.80 MW
ASDA Watford, Odhams Industrial Estate , Watford, WD24 7RT (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
4.80 MW
ASDA Waterlooville, Portland Road , Waterlooville, PO7 7XR (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
4.80 MW
ASDA Walton, Utting Avenue , Liverpool, L4 9XU (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
4.80 MW
ASDA Swindon Haydon, Orbital Shopping Park Thamesdown Drive, Swindon, SN25 4YX (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
4.80 MW
ASDA Swansea, Upper Forest Way, Morriston, SA6 8PS (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
4.80 MW
ASDA Swanley, London Road, Swanley, BR8 7UN (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
4.80 MW
ASDA Sutton Surrey, St. Nicholas Way , Sutton, SM1 1LD (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
4.80 MW
ASDA Sutton in Ashfield, Priestic Road , Sutton-In-Ashfield, NG17 2AH (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
0.02 MW
ASDA Store, Woodstock Way , Caldicot, NP26 5DB (18 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.80 MW
Loading map...
Showing 25 locations