Ide Hill Road, Bough Beech, Edenbridge TN8 7PJ (4 components)

Standby generation

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Holditch Power Station Holditch Road Lymedale Business Park Newcastle under Lyme ST5 9JA (4 components)

Three reciprocating engines each with 2.66MW capacity. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
High Street Waterham Kent ME13 9EJ (3 components)

6 CHP engines of 1.5MW each. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Harbour House, Marine Parade Dover Kent CT17 9BU (5 components)
• Multiple POSGUs (standby diesel generators).
• Sixteen POSGUs (standby diesel generators).
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Goudhurst Pumping Station, Bluecoats Lane, Cranbrook, TN17 1HB (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Gogar Station Road, Gogarburn Edinburgh EH12 1HQ (4 components)

Four POSGUs (standby diesel generators) each having 1.4MW capacity.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Godmersham Pumping Station, Canterbury Road, Canterbury, CT4 7DP (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Energy Centre, Quarryfield Road, Gateshead NE8 3BE (16 components)
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
• 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
• CHP in a district heating environment, providing heat & electricity to local area and exporting excess.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Elmer Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (6 components)

Combination of load curtailment and standby generation

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Dunswell Road, Cottingham, Hull HU16 4JT (3 components)

Two CHP engines, 1.94MW and 1.46MW (total 3.4MW) in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas