ENERSYST LIMITED

2 unique locations (6 components)

Rockingham South, Smoke Lane, Avonmouth, BS11 0YT. (1 component)

The CMU will consist of 1 x 2 MW OCGT gas fired engine. It will have its own individual metering arrangements, but will share the grid connection point with 4 …

Inactive • 2022-23 (T-4)
Rockingham South, Smoke Land, Avonmouth BS11 0YT (5 components)
• 10 x 2MW OCGT gas reciprocating engines
• 3 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW