Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENERSYST LIMITED

114 unique locations (488 components) - Page 2 of 12

St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (22 components)
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme (2)
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2027-28 (T-4) ...
65.75 MW
St Johns Town of Dalry, Castle Douglas Kirkcudbright, DG7 3ST (4 components)
• Carsfad hydro power station - Unit 1, part of the Galloway hydroelectric scheme (2)
• Carsfad hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2027-28 (T-4)
21.86 MW
St Johns Town of Dalry Castle, Douglas Kirkcudbright, DG7 3SR (4 components)
• Earlstoun hydro power station - Unit 1, part of the Galloway hydroelectric scheme (2)
• Earlstoun hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2027-28 (T-4)
25.51 MW
STARTFORTH PARK BARNARD CASTLE DL12 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
South West side of the A444, Castle Gresley, DE11 9ES (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2026-27 (T-4)
3.13 MW
SIDS FIELD CASTLE CARROCK BRAMPTON CA8 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
SAWMILL CASTLE BARTON CULMSTOCK ROAD HEMYOCK CULLOMPTON DEVON EX15 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Rougham Industrial Estate, Horizon House, Fred Castle Way, Bury St Edmunds, Rougham IP30 9ND, United Kingdom (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Rougham Industrial Estate, Horizon House, Fred Castle Way, Bury St Edmunds, Rougham IP30 9ND (3 components)

load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)

Active • 2026-27 (T-4), 2023-24 (T-1)
Rockingham South, Smoke Land, Avonmouth BS11 0YT (5 components)
• 3 x 2MW OCGT gas reciprocating engines
• 4 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs …
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Loading map...
Showing 10 locations