Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

298 unique locations (2484 components) - Page 6 of 12

Active MW: 3374.69 MW
Inactive MW: 6803.92 MW
Havant Pumping Station, Brockhampton Road, Havant, Havant, P09 1 (4 components)

"Portsmouth Water Havant Pumping Station, Brockhampton Road, Havant, Havant, P09 1 The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation …

Active • 2017-18 (TR)
Harwich & Dovercourt STW, HARWICH & DOVERCOURT STW - S2, Ray Lane, Ramsey, HARWICH Essex, CO12 5HD (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Haltwhistle, Bxl Plenmeller Works, Haltwhistle, Northumberland, NE49 0HN (11 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2023-24 (T-1), 2022-23 (T-1) ...
9.01 MW
Halton General Hospital, HospitalWay, Runcorn, Cheshire WA7 2DA (7 components)

1 x Natural Gas Fired CHP unit

Active • 2019-20 (T-1)
Hall WTW, Hall Water Treatment Works, Collingham Road, Newton-On-Trent, LINCOLN, LN1 2LL (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Grove WTW, GROVE WW, Track off Main Street, Grove, RETFORD Nottinghamshire, DN22 0RJ, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Great Wratting WTW, GT WRATTING-WW, School Road, Gt Wratting, HAVERHILL Suffolk, CB9 7HA (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Great Houghton HL, GT HOUGHTON HL, Leys Lane, Great Houghton, NORTHAMPTON, NN4 0AN, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Great Horkesley WW, GT HORKESLEY-TOGGS LA WTW, Tog Lane, Gt Horkesley, COLCHESTER, CO6 4BX (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Grafham WTW, GRAFHAM WTW, Perry, HUNTINGDON Cambridgeshire, PE28 0BW, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Grafham INTAKE WA, GRAFHAM INTAKE (OFFORD) WA S2, Offord, HUNTINGDON Cambridgeshire, PE19 5RG, (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
GRAFHAM DAM PS, PERRY, PE28 0BW (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2023-24 (T-1), 2022-23 (T-1) ...
8.08 MW
GRAFHAM DAM PS , PERRY, PE28 0BW (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2022-23 (T-1), 2021-22 (T-4)
GRAFHAM DAM PS , PERRY, PE19 5XH (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2023-24 (T-1)
8.08 MW
Gorse Street, Blackburn, BB1 3EU (4 components)

"EMR European Metal Recycling Gorse Street, Blackburn, BB1 3EU The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Active • 2017-18 (TR)
Gold Cross, Pensford, Bristol, BS39 4DL (4 components)

"Bristol Water Plc Gold Cross, Pensford, Bristol, BS39 4DL The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency …

Active • 2017-18 (TR)
Glandford WS, Glandford Water Treatment Work, Glandford Road, Glandford, HOLT Norfolk, NR25 7TR, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Gillman Road, Farlington Water, Treatment Works Farlington, PO6 1BT (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2020-21 (T-1)
Gibbet Hill Road, Coventry, West Midlands, CV4 7AL (45 components)

One of six CHP units at University of Warwick, Gibbet Hill Road, Coventry, West Midlands, CV4 7AL

Active • 2021-22 (T-4), 2020-21 (T-4) ...
Funtington, Chinchester, PO18 9LG (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2020-21 (T-1)
Funtington, Chinchester, Chinchester, P018 (4 components)

"Portsmouth Water Funtington, Chinchester, Chinchester, P018 The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes that is …

Active • 2017-18 (TR)
Fring WTW, FRINWW, Fring Road, Great Bircham, KING'S LYNN Norfolk, PE31 6SH, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Franklaw, Catterall Lane, Catterall, UK, PR3 0PJ (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2023-24 (T-1), 2022-23 (T-1)
6.04 MW
Four Ashes ERF, Enterprise Drive, Wolverhampton, WV10 7DF (4 components)

Municipal waste incineration plant located in Wolverhampton, Staffordshire. It is based on boilers supplying steam to a turbine-generator.

Active • 2021-22 (T-1)
Forum Reservoir, Downside, Shepton Mallet, Somerset, BA4 4JR (4 components)

"Bristol Water Plc Forum Reservoir, Downside, Shepton Mallet, Somerset, BA4 4JR The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation …

Active • 2017-18 (TR)
Loading map...
Showing 25 locations