Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

384 unique locations (1528 components) - Page 38 of 39

Almondsbury Pump Station, Highwood Lane, Almondsbury, Bristol, BS12 5DJ (2 components)

"Bristol Water Plc Almondsbury Pump Station, Highwood Lane, Almondsbury, Bristol, BS12 5DJ The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby …

Inactive • 2017-18 (TR)
1.45 MW
Alexandra Building, Alexandra Dock 1, Bootle, L20 1BX (2 components)

"EMR European Metal Recycling Alexandra Building, Alexandra Dock 1, Bootle, L20 1BX The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Inactive • 2017-18 (TR)
0.68 MW
Aldingbourne Pumping Station, Sheepwash Lane, Chichester, P020 6XX (2 components)

"Portsmouth Water Aldingbourne Pumping Station, Sheepwash Lane, Chichester, P020 6XX The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for …

Inactive • 2017-18 (TR)
0.68 MW
Alderly, Wotton-Under-Edge, Gloucestershire, GL12 7PQ (2 components)

"Bristol Water Plc Alderly, Wotton-Under-Edge, Gloucestershire, GL12 7PQ The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes …

Inactive • 2017-18 (TR)
1.45 MW
ADM Milling, Leith, Edinburgh EH6 6PQ (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2022-23 (T-1)
1.88 MW
Addenbrookes Hosp (Pasa Purchase), Hills Road, Cambridge, CB2 0SB (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1)
7.18 MW
2 LIVINGSTONE BOULEVARD, HAMILTON INTNL TECHNOLOGY PARK, BLANTYRE, GLASGOW, G72 0BP (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1)
7.18 MW
29 Bider Street, Dock Road, London, E16 4SZ (2 components)

"EMR European Metal Recycling 29 Bider Street, Dock Road, London, E16 4SZ The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Inactive • 2017-18 (TR)
0.68 MW
25 Knowsthorpe Way, Cross Green Ind Est, Leeds, LS9 0SW (2 components)

"EMR European Metal Recycling 25 Knowsthorpe Way, Cross Green Ind Est, Leeds, LS9 0SW The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Inactive • 2017-18 (TR)
0.68 MW
1 Midland Road, London, NW1 IAT (2 components)

One GE Genbacher 612GS 2MWe CHP engine and one Caterpillar C175-16 ACERT 2.4MWe diesel backup generator

Inactive • 2019-20 (T-1)
1.80 MW
Loading map...
Showing 10 locations