Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

231 unique locations (1057 components) - Page 23 of 24

BANKFIELD QUARRY, PIMLICO, CLITHEROE, LANCASHIRE, BB7 4QA (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Ashton Keynes WTW, North End, Ashton Keynes, Swindon, United Kingdom, SN6 6NZ (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4)
ASHBURY SITE, BESSEMER STREET, MANCHESTER, LANCASHIRE, M11 2NH. (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4)
21.54 MW
ASHBURY SITE, BESSEMER STREET, MANCHESTER, LANCASHIRE, M11 2NH (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
64.89 MW
Ardleigh WTW, ARDLEIGH-WW, Clover Way, Ardleigh, COLCHESTER, CO7 7PT (5 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
1.98 MW
ARDLEIGH-RIVER INTAKE PS, BY RIVER COLNE OP ROUSE WAY IPSWICH ROAD, CO4 0XB (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Inactive • 2022-23 (T-1), 2021-22 (T-4)
1.11 MW
Anwick STW, ANWICK STW, River Lane, Anwick, SLEAFORD Lincolnshire, NG34 9SP, (5 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
1.98 MW
ADM Milling, Leith, Edinburgh EH6 6PQ (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2022-23 (T-1)
1.88 MW
Addenbrookes Hosp (Pasa Purchase), Hills Road, Cambridge, CB2 0SB (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1)
7.18 MW
2 LIVINGSTONE BOULEVARD, HAMILTON INTNL TECHNOLOGY PARK, BLANTYRE, GLASGOW, G72 0BP (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1)
7.18 MW
Loading map...
Showing 10 locations