Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

704 unique locations (7037 components) - Page 23 of 29

Active MW: 1593.75 MW
Inactive MW: 8584.86 MW
Riddlesworth WS, RIDDLESWORTH WTW, Riddlesworth, DISS Norfolk, IP22 2TD, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Ringwood Southampton Rd - Bournemouth BH24 1HB (1 component)

Commercial sites

Active • 2024-25 (T-1)
9.48 MW
River Itchen Water Treatment Works, Allington Lane, Eastleigh, Eastleigh, S030 (5 components)

"Portsmouth Water River Itchen Water Treatment Works, Allington Lane, Eastleigh, Eastleigh, S030 The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Active • 2017-18 (TR)
RIVERSIDE WHARF 40-45, HERRINGHAM ROAD, LONDON, SE7 8SJ (7 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2023-24 (T-4), 2021-22 (T-1) ...
21.54 MW
Robinson House, Whiteley Road, Blaydon, NE21 5RZ (5 components)

"EMR European Metal Recycling Robinson House, Whiteley Road, Blaydon, NE21 5RZ The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Active • 2017-18 (TR)
Romsey The Hundred - Southampton SO51 8GD (1 component)

Commercial sites

Active • 2024-25 (T-1)
8.95 MW
ROOM SOUTH QUARRY, BROOM CROSS ROAD, STANFORD, SG18 9LB (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2023-24 (T-4), 2021-22 (T-4) ...
Rotherham, (Aldwarke Works), Aldwarke Lane, Rotherham, South Yorkshire, S60 1DW (3 components)

Industrial Electricity Demand Reduction resulting in reduced electricity imports

Active • 2021-22 (T-4), 2020-21 (T-4)
Runton STW, CROMER STW, Holt Road, CROMER Norfolk, NR27 9JR (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Rushall WTW, RUSHALL WW, Waterworks Lane, Rushall, DISS Norfolk, IP21 4QG (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Rushbrooke WS, RUSHBROOKE-WS, Rushbrooke Lane, BURY ST. EDMUNDS Suffolk, IP30 0ER (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Saffron Waldon STW, SAFFRON WALDEN STW, Windmill Hill, SAFFRON WALDEN Essex, CB10 1BX (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Saltersford WTW, SALTERSFORD WTW - S1, Waterworks Office, Waterworks Lane, GRANTHAM Lincolnshire, NG31 7UL, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Samian Way, Aston, Clinton ,Aylesbury, England, HP22 5EZ (52 components)

CHP unit

Active • 2025-26 (T-1), 2025-26 (T-4) ...
Sandown 15 High St - Channel Islands and IOW PO36 8DA (1 component)

Commercial sites

Active • 2024-25 (T-1)
8.95 MW
Sandy Lane, Worksop, England, S80 3ET (4 components)

"EMR European Metal Recycling Sandy Lane, Worksop, England, S80 3ET The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Active • 2017-18 (TR)
SCHOLES LODGE LANE SCHOLES LEEDS LS15 (8 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
Seaford Broad St - Brighton and East Sussex BN25 1LS (1 component)

Commercial sites

Active • 2024-25 (T-1)
8.95 MW
Seal Sands, Middlesborough, TS2 1UB (43 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Active • 2022-23 (T-4), 2021-22 (T-4) ...
Seal Sands, Middlesbrough, TS2 1UB (43 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Active • 2022-23 (T-4), 2021-22 (T-4) ...
Semer WTW, Semer WTW, Hadleigh Road, Inbetween Semer/Nedging, IPSWICH, IP7 7HF, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Sevenoaks High St - North and West Kent TN13 1XA (1 component)

Commercial sites

Active • 2024-25 (T-1)
9.48 MW
Shalford WTW, The Street, Shalford, Guildford, United Kingdom, GU4 8BW (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.09 MW
Loading map...
Showing 25 locations