Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

704 unique locations (7037 components) - Page 18 of 29

Active MW: 1593.75 MW
Inactive MW: 8584.86 MW
Level Mare Lane, Westergate Pumping Station, Chichester, PO20 3SB (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2020-21 (T-1)
Leys Rd, Brockmoor, Brierley Hill DY5 3UJ, United Kingdom (5 components)

The CMU Component reduces demand

Active • 2025-26 (T-4), 2024-25 (T-1) ...
3.81 MW
Lifton, Radstock, BA3 4PR (5 components)

"Bristol Water Plc Lifton, Radstock, BA3 4PR The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes that …

Active • 2017-18 (TR)
Littlecoates WW, LITTLECOATES WW, Chelmsford Avenue, GRIMSBY, DN34 5BY, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Littleton Raw Water PS, Ashford Road, , Staines, United Kingdom, TW18 1RU (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.00 MW
Littleton-upon-Severn, Bristol, BS35 1NT (5 components)

"Bristol Water Plc Littleton-upon-Severn, Bristol, BS35 1NT The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes that …

Active • 2017-18 (TR)
Loch Eilde Mor Hydro, Kinlocheven PH50 4SF (2 components)

Hydroelectric power generation

Active • 2025-26 (T-4)
Lockerbie Creamery, Lockerbie, England. DG11 1LW (28 components)

CHP unit

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Lockwood Shaft Raw Water, Ferry Lane, Waltham Forest, London, United Kingdom, N17 9NF (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.00 MW
London Eltham - Southeast London SE9 1BW (1 component)

Commercial sites

Active • 2024-25 (T-1)
9.48 MW
London Rd, Purfleet RM19 1SD (45 components)

Gas-fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
London Road, Biggleswade, SG18 9TH (5 components)

"Anglian Water Services Ltd London Road, Biggleswade, SG18 9TH The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency …

Active • 2017-18 (TR)
London South Woodford - Romford and Ilford E18 1AY (1 component)

Commercial sites

Active • 2024-25 (T-1)
9.48 MW
London Underground, Mansell Street, London E1 8AA (6 components)

Standby generation

Active • 2017-18 (T-1)
Lots Road, Chelsea, London SE10 0QG (15 components)

Standby generation

Active • 2022-23 (T-1), 2021-22 (T-1) ...
Lots Road, Chelsea, London SW10 0SW (10 components)

Standby generation

Active • 2025-26 (T-1), 2025-26 (T-4) ...
9.98 MW
Louth STW, LOUTH STW, Keddington Lane, Heddington Corner, LOUTH Lincolnshire, LN11 7DX, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Lovedean Lane, Lovedean Pumping Station, Waterlooville, PO8 9RY (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2020-21 (T-1)
Lovedean Pumping Station, Lovedean Lane, Waterlooville, P08 9RY (5 components)

"Portsmouth Water Lovedean Pumping Station, Lovedean Lane, Waterlooville, P08 9RY The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for …

Active • 2017-18 (TR)
Lovely Lane, Warrington, Cheshire WA5 1QG (8 components)

Natural Gas fired CHP unit at Warrington Hospital, Lovely Lane, Warrington, Cheshire WA5 1QG

Active • 2020-21 (T-4), 2017-18 (T-1)
Lower Lane, Bishops Waltham, Bishops Waltham, Southampton, SO32 1AS (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2020-21 (T-1)
Loading map...
Showing 25 locations