Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

384 unique locations (1528 components) - Page 16 of 39

Active MW: 3644.08 MW
Inactive MW: 6534.53 MW
Fornham - Pigeon Lane TPS, FORNHAM ALL STS-PIGEON LN TPS, Pigeon Lane, Fornham All Saints, BURY ST. EDMUNDS Suffolk, IP28 6JP (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Fornham STW, FORNHAM ALL SAINTS STW, Fornham All Saints, Fornham Park, BURY ST. EDMUNDS Suffolk, IP28 6JH (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
FORREST FARM, CALDERCRUIX, AIRDRIE, LANARKSHIRE, ML6 8NX (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Fortis Green WBS, Woodside Avenue, Haringey, London, United Kingdom, N10 3HX (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4)
Forum Reservoir, Downside, Shepton Mallet, Somerset, BA4 4JR (2 components)

"Bristol Water Plc Forum Reservoir, Downside, Shepton Mallet, Somerset, BA4 4JR The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation …

Inactive • 2017-18 (TR)
Four Ashes ERF, Enterprise Drive, Wolverhampton, WV10 7DF (2 components)

Municipal waste incineration plant located in Wolverhampton, Staffordshire. It is based on boilers supplying steam to a turbine-generator.

Inactive • 2021-22 (T-1)
Franklaw, Catterall Lane, Catterall, UK, PR3 0PJ (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1), 2022-23 (T-1)
Fring WTW, FRINWW, Fring Road, Great Bircham, KING'S LYNN Norfolk, PE31 6SH, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Funtington, Chinchester, Chinchester, P018 (2 components)

"Portsmouth Water Funtington, Chinchester, Chinchester, P018 The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes that is …

Inactive • 2017-18 (TR)
Funtington, Chinchester, PO18 9LG (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Loading map...
Showing 10 locations