Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CORBY POWER LIMITED

97 unique locations (2173 components) - Page 1 of 4

Active MW: 680.27 MW
Inactive MW: 1799.71 MW
AB35 (5 components)
• Domestic EV
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
ACORN WAY CORBY NORTHAMPTONSHIRE NN18 (4 components)

EV charging at residential premises

Active • 2023-24 (T-1)
ADM Milling, 9 Brunel Rd, Corby NN17 4SL (18 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
AINTREE ROAD CORBY NORTHANTS NN18 (16 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
AIRFIELD WAY WELDON CORBY NORTHAMPTONSHIRE NN17 (16 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
AIRFIELD WAY, WELDON, CORBY, NORTHAMPTONSHIRE, NN17 (15 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Akerman Road, Lambeth, London, SW9 6SN (13 components)

A reciprocating gas engine CHP site providing hot water to a local district heating network.

Active • 2021-22 (T-4), 2020-21 (T-4) ...
AL5 (104 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
ASDA Store, Off Lombard Street NG24 1XG (12 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
ASDA Store, Stamfordham Road Westerhope, Newcastle, NE52LD (17 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Barn Main Street West Witton LEYBURN NORTH YORKSHIRE DL8 (4 components)

EV charging at residential premises

Active • 2023-24 (T-1)
BARTLETT CLOSE CORBY NORTHHAMPTONSHIRE NN18 (16 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Beanfield No 1 HL, BEANFIELD #1 HL, Uppingham Road, CORBY Northamptonshire, NN17 2UJ (11 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Berry, Corby BMS Sallow Road, Weldon Industrial Estate, Corby, Northamptonshire, NN17 5JX (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
BIRKDALE DRIVE CORBY NORTHAMPTONSHIRE NN17 (16 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
BIRKDALE DRIVE, CORBY, NORTHAMPTONSHIRE, NN17 (14 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
BLAIRGOWRIE ROAD CORBY NORTHAMPTONSHIRE NN17 (16 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
BN15 (34 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-1) ...
BN2 (57 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BRIERY CLOSE GREAT OAKLEY CORBY NORTHAMPTONSHIRE NN18 (13 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
BUTTERCUP CLOSE CORBY NORTHAMPTONSHIRE NN18 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
BWW028, Sperrings Green, Chewton Mendip, Chewton Mendip, BA3 4LN (23 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT (4 components)
• An 87.500 MW Battery Storage Site Component.
• An 87.500 MW New Build Battery Storage Site Component
• An 87.500 MW New Build Battery Storage Site Component.
Active • 2028-29 (T-4)
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (43 components)
• Gas Turbine CHP GT001A
• Gas Turbine CHP GT001B
• Steam Turbine CHP
Active • 2026-27 (T-4), 2023-24 (T-4) ...
Cartmel Drive Corby Northants NN18 (15 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 25 locations