Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

69 unique locations (581 components) - Page 2 of 7

Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (13 components)

Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
41.29 MW
Priory Street, Ware, Hertfordshire, SG12 0DJ (9 components)

On-site existing CHP generating unit (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Poplar Avenue, King' Lynn, PE34 3AL (10 components)

Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to … (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Park Road, Ware. Hertfordshire, SG12 0DP (20 components)

On-site existing CHP generating unit (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
North Lonsdale Road, Cumbria, Ulverston, LA12 9DR (10 components)

On-site existing CHP generating unit (3)

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
North Avenue, Marston Green, Birmingham, B40 1NT. (6 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT (12 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
Active • 2024-25 (T-4), 2023-24 (T-4) ...
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, Leicestershire, LE19 1SU. (2 components)

Distribution Centre with behind the meter back up generation (2)

Active • 2025-26 (T-4), 2024-25 (T-4)
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, LE19 1SU (6 components)

Distribution Centre with behind the meter back-up generation. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Moorcroft Drive Wednesbury WS10 7DE (6 components)

EnerG 1000 CHP (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.91 MW
Loading map...
Showing 10 locations