Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

23 unique locations (502 components)

Active MW: 1658.75 MW
Inactive MW: 3375.49 MW
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (23 components)
• Power Station for Paper plant made up of 1x35MW Gas engine
• Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine
Active • 2022-23 (T-4), 2023-24 (T-4) ...
Priory Street, Ware, Hertfordshire, SG12 0DJ (22 components)

On-site existing CHP generating unit

Active • 2021-22 (T-1), 2022-23 (T-3) ...
Poplar Avenue, King' Lynn, PE34 3AL (16 components)

Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to …

Active • 2022-23 (T-4), 2023-24 (T-4) ...
17.99 MW
Park Road, Ware. Hertfordshire, SG12 0DP (42 components)

On-site existing CHP generating unit

Active • 2021-22 (T-4), 2022-23 (T-3) ...
North Avenue, Marston Green, Birmingham, B40 1NT. (12 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.

Active • 2021-22 (T-1), 2022-23 (T-3) ...
North Avenue, Marston Green, Birmingham, B40 1NT (26 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
Active • 2021-22 (T-1), 2022-23 (T-3) ...
2.92 MW
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, Leicestershire, LE19 1SU. (1 component)

Distribution Centre with behind the meter back up generation

Active • 2024-25 (T-4)
Maidenhead Road, Windsor, SL4 5GD (15 components)
• Battery Storage
• Battery storage
• Battery strorage unit
Active • 2019-20 (T-1), 2021-22 (T-1) ...
Harmire Road, Barnard Castle, County Durham, DL12 8DT (33 components)

On-site existing CHP generating unit

Active • 2021-22 (T-4), 2022-23 (T-3) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (15 components)

On-site existing CHP generating unit

Active • 2021-22 (T-1), 2021-22 (T-4) ...
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (38 components)

On-site existing CHP generating unit

Active • 2021-22 (T-1), 2022-23 (T-3) ...
Denison Road, Selby, North Yorkshire YO8 8AN (24 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2021-22 (T-4), 2022-23 (T-3) ...
Denison road, Selby, North Yorkshire, YO8 8AN. (14 components)

Gas Turbine Cogeneration Unit GT3

Active • 2022-23 (T-1), 2023-24 (T-1) ...
Darent Valley Hospital, Darenth Wood Rd, Dartford, DA2 8DA (14 components)

1280 KWe Combined Heat and Power unit.

Active • 2021-22 (T-4), 2022-23 (T-1) ...
Cobden Street, Montrose, Angus, DD10 8EA (23 components)

On-site existing CHP generating unit

Active • 2021-22 (T-1), 2022-23 (T-3) ...
British Gas, New Bridge Ln, Stockport, SK1 2GT (16 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2021-22 (T-1), 2022-23 (T-3) ...
3.08 MW
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (40 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2021-22 (T-4), 2022-23 (T-3) ...
Bones lane, Cheddleton, Leek, Staffordshire, ST13 7BT (10 components)

1.9 MW Gas gen ENER-G 1999

Active • 2021-22 (T-4), 2022-23 (T-3) ...
Barrack Road, Exeter, EX2 5DW. (8 components)

1.521 MW CHP unit

Active • 2021-22 (T-4), 2023-24 (T-1) ...
2600 John Smith Drive, Oxford, OX4 2JY (44 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2021-22 (T-4), 2022-23 (T-3) ...
1 Waterfront Avenue, Edinburgh, EH5 1SG (32 components)
• Office site with behind the meter back up generation
• Office site with behind the meter generation
• Office site with behind the meter generation.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 23 locations