CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

8 unique locations (187 components)

Active MW: 1658.75 MW
Inactive MW: 3375.49 MW
Poplar Avenue, King' Lynn, PE34 3AL (16 components)

Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to …

Active • 2022-23 (T-4), 2023-24 (T-4) ...
17.99 MW
North Avenue, Marston Green, Birmingham, B40 1NT. (12 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.

Active • 2021-22 (T-1), 2022-23 (T-3) ...
North Avenue, Marston Green, Birmingham, B40 1NT (26 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
Active • 2021-22 (T-1), 2022-23 (T-3) ...
2.92 MW
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, Leicestershire, LE19 1SU. (1 component)

Distribution Centre with behind the meter back up generation

Active • 2024-25 (T-4)
British Gas, New Bridge Ln, Stockport, SK1 2GT (16 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2021-22 (T-1), 2022-23 (T-3) ...
3.08 MW
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (40 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2021-22 (T-4), 2022-23 (T-3) ...
2600 John Smith Drive, Oxford, OX4 2JY (44 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2021-22 (T-4), 2022-23 (T-3) ...
1 Waterfront Avenue, Edinburgh, EH5 1SG (32 components)
• Office site with behind the meter back up generation
• Office site with behind the meter generation
• Office site with behind the meter generation.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 8 locations