Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

22 unique locations (150 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
2 Leeds City Office Park, Leeds, LS11 5BD (8 components)
• Office site with behind the meter back-up generation (2)
• Office site with behind the meter back-up generation.
DSR Veolia UK Limited Conditional LS11
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
97 Talbot Road, Stretford, Manchester, Lancashire, M16 0TW (4 components)

Offsite with behind the meter generation (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Arrowe Park Road, Upton, Birkenhead, Wirral CH49 5PE (7 components)

On-site existing CHP generating unit (3)

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Blackshaw Rd, London SW17 0QT (10 components)

CHP on a hospital site

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Bott Lane, Lye, Stourbridge, West Midlands DY9 7AW (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
British Gas, Housesteads, Off Stockport Road, Hattersley, SK14 3QU (4 components)

Office site with behind the meter back-up generation.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (6 components)

Turbo Expander - for pressure reduction of incoming natural gas

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Chenhalls Road St Erth Hale Cornwall TR27 6LA (5 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Clatterbridge Road, Bebington, Birkenhead, Wirral CH63 4JY (7 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Knapton Generating Station, East Knapton, Malton, North Yorkshire, YO17 8JF (8 components)

Generating Station, the power generation facilities consist of RLM 6000 EGT generation package with a LM6000 gas turbine

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (8 components)
• 20 MW of DSR
• 20 MW of demand reduction
• 20MW Battery Storage Facility located in Sudbury, Essex.
• ... and 1 more unique description
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Maidenhead Road, Windsor, SL4 5GD (12 components)
• Battery Storage
• Battery storage
• Battery strorage unit
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (2 components)
• 0.8 MWe Gas Powered Generation Unit
• 0.8 MWe Gas powered generator
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (4 components)
• 0.8 MWe Gas Powered Generation Unit
• 0.8 MWe Gas powered generator
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (8 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network …

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Stanlow Manufacturing Complex, Ellesmere Port, Cheshire, CH65 4HB (9 components)
• 2 x On-site turbo alternators
• 6 x On-site turbo alternators
• Power Recovery Train
Inactive • 2019-20 (T-1)
Windsor Road, Redditch, Worcestershire, B97 6EF (8 components)

The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 22 locations