{# MAP SEARCH SHARED STYLES WHY: Eliminates ~700 lines of duplicate CSS across map search templates Provides consistent styling for split-screen map layout, badges, and mobile interface HOW: Include in the extra_head block in map templates after Bootstrap Icons link TEMPLATES USING THIS: - search_company_map.html - search_technology_map.html - search_cmu_map.html UPDATED: 2025-01-30 #}
Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

68 unique locations (940 components) - Page 1 of 3

Active MW: 83.70 MW
Inactive MW: 23.90 MW
195 Aylesone Rd, Leicester LE2 7QJ (17 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

DSR Reciprocating Engines GB GAS HOLDINGS LIMITED Proven DSR CMU Unproven DSR CMU CENEST CENEST1 +6 more LE2
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
1 Waterfront Avenue, Edinburgh, EH5 1SG (12 components)

Office site with behind the meter generation (3)

DSR CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Proven DSR CMU Unproven DSR CMU CENEST CENEST +2 more EH5
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2600 John Smith Drive, Oxford, OX4 2JY (19 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

DSR CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Proven DSR CMU Unproven DSR CMU CENEST CENEST1 +8 more OX4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
2 Leeds City Office Park, Leeds, LS11 5BD (4 components)
• Office site with behind the meter back-up generation (2)
• Office site with behind the meter back-up generation.
DSR GB GAS HOLDINGS LIMITED Proven DSR CMU Unproven DSR CMU CENEST Conditional LS11
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
3 Fountain Drive, Inchinnan Business Park, Paisley, PA4 9RF. (5 components)

MTU - 8V400064 1.013MW (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
97 Talbot Road, Stretford, Manchester, Lancashire, M16 0TW (2 components)

Offsite with behind the meter generation (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Arrowe Park Road, Upton, Birkenhead, Wirral CH49 5PE (3 components)

On-site existing CHP generating unit (3)

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Barrack Road, Exeter, EX2 5DW. (5 components)

1.521 MW CHP unit (3)

Active • 2026-27 (T-4), 2024-25 (T-4) ...
Blackshaw Rd, London SW17 0QT (5 components)

CHP on a hospital site (3)

CHP and autogeneration Combined Heat and Power (CHP) DISTRIBUTED ENERGY CUSTOMER SOLUTIONS LIMITED Existing Generating CMU New Build Generating CMU St George's CHP Units St George's CHP Units +1 more SW17
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
BOC Brinsworth, Bawtry Road, Brinsworth, Rotherham, S60 5NT (8 components)

Industrial Gases production processes. DSR delivered through process interruption (3)

DSR BOC LIMITED Proven DSR CMU Unproven DSR CMU BOC001 TLGUK +3 more S60
Active • 2025-26 (T-1), 2024-25 (T-1) ...
BOC Fawley, Cadland Road, Hythe, SO45 3NX (8 components)

Industrial Gases production processes. DSR delivered through process interruption (3)

DSR BOC LIMITED Proven DSR CMU Unproven DSR CMU BOC001 TLGUK +3 more SO45
Active • 2025-26 (T-1), 2024-25 (T-1) ...
BOC Margam, Longlands Lane, Port Talbot, SA13 2NS (8 components)

Industrial Gases production processes. DSR delivered through process interruption (3)

DSR BOC LIMITED Proven DSR CMU Unproven DSR CMU BOC001 TLGUK +3 more SA13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
BOC Middlesbrough, Teessdock Road, Grangetown, TS6 7RT (8 components)

Industrial Gases production site. DSR provided through process interruption. (3)

DSR BOC LIMITED Proven DSR CMU Unproven DSR CMU BOC001 TLGUK +3 more TS6
Active • 2025-26 (T-1), 2024-25 (T-1) ...
BOC Motherwell, Chapelknowle Road, Carfin, ML1 5LF (8 components)

Industrial Gases production processes. DSR delivered through process interruption (3)

DSR BOC LIMITED Proven DSR CMU Unproven DSR CMU BOC001 TLGUK +3 more ML1
Active • 2025-26 (T-1), 2024-25 (T-1) ...
BOC Scunthorpe, Warren Road, Scunthorpe, DN15 6XH (8 components)

Industrial Gases production processes. DSR delivered through process interruption (3)

DSR BOC LIMITED Proven DSR CMU Unproven DSR CMU BOC001 TLGUK +3 more DN15
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Bones lane, Cheddleton, Leek, Staffordshire, ST13 7BT (6 components)

1.9 MW Gas gen ENER-G 1999 (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (6 components)

1 * 1.7MW diesel reciprocating engine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (6 components)

1 * 1.7MW diesel reciprocating engine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (6 components)

1 * 1.7MW diesel reciprocating engine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (6 components)

1 * 1.7MW diesel reciprocating engine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW. (5 components)

CHP Engine 3.360MW (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
British Gas, 4 Marine Drive, Edinburgh, EH5 1SG (2 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (19 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

DSR Reciprocating Engines CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Proven DSR CMU Unproven DSR CMU CENEST CENEST1 +8 more G71
Active • 2025-26 (T-4), 2024-25 (T-4) ...
British Gas, Housesteads, Off Stockport Road, Hattersley, SK14 3QU (2 components)

Office site with behind the meter back-up generation. (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Loading map...
Showing 25 locations